Project type: Infrastructure and Utilities, Roads, Bridges, and Tunnels, Sanitation and Water Disposal
Completed: 1939
Quality of Information: Good
Marked:
Yes
Site Survival: Extant
View Project in a Separate Window
Description
The Works Progress Administration built a culvert at the intersection of 10thStreet and and Autumn Lane in Harrah, in 1939.
Contributor note: “This culvert carries water run-off north-south under 10th Street, about two miles west of the town of Harrah. The culvert opening is about 3 ft by 3 ft. Stamped on top of the curbing on either side of the road is the WPA shield and the date 1939.”
Source notes
Waymaking, 10th Street and Autumn Lane Culvert: (https://www.waymarking.com/waymarks/WMZ5EE_10th_Street_Autumn_Lane_Culvert_Harrah_OK), accessed September 20, 2018.
WPA concrete stamp on site.
Project originally submitted by hamquilter on September 21, 2018.